Application for Commercial Plan Approval

Open blank official PDF — Application for Commercial Plan Approval (opens in a new window)

Complete the form on screen, print it, and sign it. Nothing is transmitted from this page.

Before you start

Submit one application for each building or structure. All sections must be completed, and four sets of plans are required. See the commercial permit application instructions for what the plans must show.

Pickaway County Building Department

124 West Franklin Street, Circleville, Ohio 43113 · 740-477-8282 · Fax 740-477-8265

Application for Commercial Plan Approval

Office use

Logged In (office use)

Plan Review # (office use)

Sent / Received (office use)

Scope of project
Type of project

Project location

Building owner

Contractor

Applicant

Plans prepared by

Occupancy and construction

Construction type

This application for a building permit is required for your building project. Other permits may be required as well. These include, but are not limited to, zoning; access management (driveway permits); and compliance with the Special Purpose Flood Damage Resolution for Pickaway County (in flood hazard areas). You are responsible for determining the applicability and ensuring compliance with regulations related to your project.

All permits will expire after one year of inactivity.

Initial

Project totals

I hereby certify that all information contained in this application is true, accurate, and complete to the best of my knowledge.

Signature

Signature (sign after printing)

Building department use

Decision (completed by the department)

Plans Examiner (office use)

Date (office use)

Print name (office use)

Building Official (office use)

Date (office use)

Processed by — counter or mail (office use)

Worksheet for fees

Round up all square footage figures to the next 100 feet.

Structural fees
ItemFeeAmount
A. Processing fee per structure $250.00
B. Per 100 square feet. For example, 103 sq ft rounds to 200 sq ft $9.50
Mechanical fees
ItemFeeAmount
A. Processing fee per structure $250.00
B. Per 100 square feet. For example, 103 sq ft rounds to 200 sq ft $5.75
Electrical fees
ItemFeeAmount
A. Processing fee per structure $250.00
B. Per 100 square feet. For example, 103 sq ft rounds to 200 sq ft $5.75
D. Per alarm system device $5.75
Fire protection
ItemFeeAmount
A. Processing fee per structure $250.00
B. Per 100 square feet. For example, 103 sq ft rounds to 200 sq ft $5.75
Hood systems
ItemFeeAmount
A. Processing fee per hood $250.00
Industrialized unit fees
ItemFeeAmount
A. Processing fee per structure $200.00
B. Per 100 square feet. For example, 103 sq ft rounds to 200 sq ft $1.75

Industrialized unit fees are only required if you are placing an approved Board of Building Standards Industrialized Unit for the first time. Otherwise, ignore this fee box.

Sign fees
ItemFeeAmount
A. 0 to 15 square feet sign area $40.00
B. Over 15 to 30 square feet sign area $100.00
C. Over 30 square feet sign area $300.00
D. Multiple signs — use over 30 square feet total area and add $40.00 per sign $40.00 per sign
Special inspections
ItemFeeAmount
A. Certificate of Use & Occupancy per structure $150.00
Other — $150 per item

Plan review and totals
ItemRateAmount
A. Preliminary plan review $100.00 per hour
Plumbing fee (from Worksheet A) —
Subtotal —
Board of Building Standards (BBS) fee 3% of subtotal
Municipal and Township Surcharge, where applicable 10% of subtotal
Total —

Make fee check or money order payable to: Pickaway County Building Department. Square footage figures are rounded up to the next 100 square feet as per Section 108.2 of the OBC. Please submit 4 sets of plans.

All permit fees are non-refundable unless an error was made by the Building Department.

Worksheet A — Plumbing fee schedule

Enter the number of each fixture in the project.

Plumbing fixture counts
FixtureCount
Air Admittance Valves
Aspirators
Autopsy Tables, Morgue
Backflow Devices
Bidets
Dental Cuspidors
Dental Lavatories, Chair
Dilution Sumps
Drains, Floor
Drains, Roof Storm
Expansion Tanks
Fountains, Baptismal
Fountains, Drinking
Fountains, Soda
Fountains, Wash
Garbage Disposals
Hose Bibs, Outside
Hot Water Dispensers
Hydrotherapy Baths
Ice Makers
Interceptors, Garage/Oil
Interceptors, Grease
Interceptors, Sand
Lavatories
Piping Systems, Sanitary
Piping System, Storm
Piping Systems, Water
Sterilizers
Sump-Pumps
Softener
Sewage/Ejectors
Shampoo Bowls
Showers
Sinks, Chemical
Sinks, Clinical
Sinks, Domestic
Sinks, Floor
Sinks, Instrument
Sinks, Laboratory
Sinks, Pharmacy
Sinks, Plaster
Sinks, Scullery
Sinks, Food Prep
Sinks, Mop
Sinks, Surgical
Sinks, X-Ray
Sinks, Bar
Tubs, Bath
Tubs, Laundry
Urinals
Valves, Pressure Reducer
Valves, Tempering
Washers, Automatic
Washers, Bed Pan
Washers, Dish
Washers, Eye (Emergency)
Water Closets
Water Heaters
Total fixture count
Plumbing fees
ItemFeeAmount
Plumbing processing fee per structure $250.00
Total fixture count × $20.00 $20.00 each
Total plumbing fees —

Contractor and subcontractor information

General contractor

Provide a list of all subcontractors. All subcontractors must be registered before a permit can be issued. See Contractor / Sub-Contractor Registration.

Subcontractors
Type of workContractor DBA and/or nameLocal registration #

Nothing on this page is transmitted to the county. Print it, sign it, and deliver it as the form directs.