Residential Building Plan Approval Application

Open blank official PDF — Residential Building Plan Approval Application (opens in a new window)

Complete the form on screen, print it, and sign it. Two sets of plans are required. Nothing is transmitted from this page.

Pickaway County Building Department

124 West Franklin Street, Circleville, Ohio 43113 · 740-477-8282 · Fax 740-477-8265

Residential Building Plan Approval Application

2 sets of plans required. Please print or type.

Office use

Logged In (office use)

Plan Review # (office use)

Project location

Type of project

Building / property owner

Contractor

Applicant

Plans prepared by

Dwelling details

Basement?

Dwelling type

This application for a building permit is required for your building project. Other permits may be required as well. These include, but are not limited to, zoning; access management (driveway permits); and compliance with the Special Purpose Flood Damage Resolution for Pickaway County (in flood hazard areas). You are responsible for determining the applicability and ensuring compliance with regulations related to your project.

All permits will expire after one year of inactivity with this building department.

Initial

Project totals

I hereby certify that all information contained in this application is true, accurate, and complete to the best of my knowledge.

Signature

Signature (sign after printing)

Building department use

Decision (completed by the department)

  • Approved
  • Partial Approval
  • Correction Letter

Plans Examiner (office use)

Date (office use)

Building Official (office use)

Date (office use)

All contractors must be registered before a permit can be issued.

Residential building fee schedule

Living space, basements and attached garages, square feet.

Residences — blanket permit, except temporary electric and new electric service, which are additional.

Dwellings
ItemFeeAmount
Single Family Dwelling — first 2000 square feet $300.00
Plus $10.00 per each additional or part of 100 square feet over 2000 square feet including garage and basement total $10.00
Two (2) Family Dwelling — first 2000 square feet $400.00
Plus $10.00 per each additional or part of 100 square feet over 2000 square feet including garage and basement total $10.00
Three (3) Family Dwelling — first 2000 square feet $500.00
Plus $10.00 per each additional or part of 100 square feet over 2000 square feet including garage and basement total $10.00
Additions, alterations and remodels
ItemFeeAmount
Garage / Shed / Pole Barns / Shelter Houses (not required if under 200 square feet) $50.00
Plus $10.00 per 100 square feet or part of 100 square feet $10.00
Remodeling 1 room $50.00
Remodeling 2+ rooms $100.00
Room Addition $100.00
Plus $10.00 per 100 square feet or part of 100 square feet $10.00
Roof Replacement $100.00
Patio, deck or porch with a roof $100.00
Enclosed porches or enclosing existing porches $100.00
Decks (30 inches or more above grade regardless of size) $50.00
Other construction
ItemFeeAmount
Swimming pools over 30″ deep (if built with deck or porch, fill in above) $100.00
Unattached accessory buildings (yard sheds). Less than 200 square feet and not permanently anchored: no permit required $50.00
Inspection only $50.00
Replacing hot water tanks, replacing furnaces, replacing air conditioners $50.00 each
Industrialized Unit Fee $200.00
Plus $1.30 per 100 square feet or part of 100 square feet $1.30

Fees for all other construction subject to the Building Code shall be calculated at the rate of $50.00 per inspection.

Electric fees
ItemFeeAmount
Temporary Electric Service $50.00
New Electric Service / Upgrade Inspection $100.00
Total
ItemRateAmount
Subtotal —
State Board of Building Standards Fee 1% of subtotal
Municipal and Township Surcharge Fee 10% of subtotal
Total Permit Fee —

Make checks or money order payable to: Pickaway County Building Department.

All permit fees are non-refundable unless an error was made by the Building Department.

Electric requirements

Electric service

Load calcs that comply with the NEC may be used to size electric service. The alternate method below may be used instead of load calcs.

  • Minimum service 150 AMP with gas furnace, water heater, and stove. #1 AWG copper or #2/0 AWG aluminum wire for service.
  • Minimum service 200 AMP with any electric furnace, water heater, or stove. #2/0 AWG copper or #4/0 AWG aluminum wire for service.
  • Grounding and bonding of service to comply with NEC including rebar in footer if 20 feet or over in overall connected length.

Suggested electric panel schedule with wire sizes. Check off the circuits included.

Suggested electric panel schedule
IncludeCircuitBreakerWire
Kitchen Small Appliance * 20 AMP 12 AWG Wire
Kitchen Small Appliance * 20 AMP 12 AWG Wire
Laundry * 20 AMP 12 AWG Wire
Bathroom * 20 AMP 12 AWG Wire
Furnace * 15 AMP 14 AWG Wire
Dryer 30 AMP 10 AWG Wire
Dishwasher 15 AMP 14 AWG Wire
Range 50 AMP 6 AWG Wire
Garbage Disposal 15 AMP 14 AWG Wire
Sump Pump 15 AMP 14 AWG Wire
Water Heater 30 AMP 10 AWG Wire

* Required circuits.

  • Show location of meter base and service panel.
  • Show location of smoke detectors.
  • Outlet locations to comply with the NEC.

Contractor / subcontractor list

Please complete information. All contractors and subcontractors must be registered with the Pickaway County Building Department to work in Pickaway County. Noncompliance will result in a stop work order being issued on the project until all contractors have the proper registration(s). Any work being done with contractors not registered will NOT receive an inspection until that contractor has registered locally.

Contractors and subcontractors
TypeContractor nameLocal registration no.
General Contractor
Foundation Contractor
Brick Mason
Concrete Contractor
Drywall Contractor
Insulation Contractor
Framing Contractor
Roofing Contractor
Plumbing Contractor
Electrical Contractor
HVAC Contractor

Nothing on this page is transmitted to the county. Print it, sign it, and deliver it as the form directs.